Jump to content


Photo
- - - - -

What type of metal to use?


  • Please log in to reply
5 replies to this topic

#1 TCBLF

TCBLF

    Member

  • Members
  • PipPip
  • 15 posts
  • LocationNor Cal

Posted 18 November 2009 - 12:02 PM

I am planning to weld up a new 2 tier brew sculpture. I am trying to figure out what is the best type and gauge of metal to use for fabrication. I typical brew 11 gallon batches. Looking for advice and suggestions…Thanks

#2 Greatfookin

Greatfookin

    Advanced Member

  • Members
  • PipPipPip
  • 427 posts
  • LocationRiver Grove , Illinois

Posted 18 November 2009 - 12:14 PM

Budget, availability, welding ability?

#3 strangebrewer

strangebrewer

    Frequent Member

  • Moderators
  • PipPipPipPip
  • 1507 posts
  • LocationDenver, CO

Posted 18 November 2009 - 12:46 PM

Budget, availability, welding ability?

+1I used free bed frame rails off craigslist. I can weld steel so it was a no brainer.

#4 TCBLF

TCBLF

    Member

  • Members
  • PipPip
  • 15 posts
  • LocationNor Cal

Posted 18 November 2009 - 01:00 PM

Budget, availability, welding ability?

Budget – Lower the better, more money for stainless bits and pieces.Availability – I have a couple of metal/welding shop locally.Welding ability- Minimal, my buddy and I use an ancient stick welder on tube steel to build a 3 tier. That was are are only welding experience. It still stands sturdy and works like a champ. I need to go to a 2 tier due to space and ceiling height are only reason why I need a new brew rig.

#5 TCBLF

TCBLF

    Member

  • Members
  • PipPip
  • 15 posts
  • LocationNor Cal

Posted 18 November 2009 - 01:01 PM

+1I used free bed frame rails off craigslist. I can weld steel so it was a no brainer.

Any pics of your rig??

#6 strangebrewer

strangebrewer

    Frequent Member

  • Moderators
  • PipPipPipPip
  • 1507 posts
  • LocationDenver, CO

Posted 18 November 2009 - 01:29 PM

Any pics of your rig??

Not handy but it's as simple as simple can be. Right now mine is a single tier since I have a pump but I am planning to add a 2nd tier to it so I can gravity feed my strike and sparge water. It's rectangular in shape and has enough space under it so I can gravity feed and prime the pump as well as fit a burner underneath. Nothing fancy at all.


2 user(s) are reading this topic

0 members, 2 guests, 0 anonymous users